Project Overview
Anchoring Rope and Rigging worked with RailCorp to deliver a permanent strengthening solution for Platform Six at Redfern Station in New South Wales.
The project involved supplying and installing 23 HULK percussion-driven earth anchors to stabilise the existing brick platform wall and address long-standing signs of structural deterioration.
Project Details
Client: RailCorp
Location: Redfern Station, New South Wales
Application: Heritage railway platform wall stabilisation
Scope: Supply, installation, proof testing and lock-off of 23 HULK percussion anchors
Anchor depth: 5 metres at 1.5m centres
Proof test load: 13 kN
Lock-off load: 8 kN
Project Background
Platform Six at Redfern Station was originally constructed in 1891.
After more than a century of service, the platform had developed visible signs of deterioration, including bulging brick walls and cracking through sections of the platform deck and side walls.
A permanent strengthening solution was required to restrain the existing platform wall, prevent further movement and extend the service life of the structure.
The solution also needed to be installed within a highly restricted railway possession window, making buildability, speed and reliability critical project requirements.
The Engineering Solution
RailCorp and Anchoring Rope and Rigging worked collaboratively to develop a tie-back anchoring system using HULK Earth Anchors.
The platform wall was stabilised using 23 percussion-driven anchors installed at 1.5-metre centres. Each anchor was driven to a depth of 5 metres on a 30-degree downward angle, providing lateral restraint to the existing brick wall.
The anchors were fitted with 5-metre tendons and integrated into the platform strengthening system to create a permanent tie-back solution.
Installation Under a Tight Rail Possession
All remedial works had to be completed within a 28-hour working window.
During the possession, 105 mm-diameter holes were cored and drilled through the existing brick platform wall to provide access for the anchor installation.
The HULK percussion anchors were then installed through the wall using compact equipment, allowing the crew to work efficiently within the constrained platform environment.
The ease of installation and limited equipment footprint were key advantages, particularly where conventional excavation, piling or large drilling equipment would have been difficult to accommodate.
Proof Testing and Lock-Off
Following installation, each anchor was proof tested to 13 kN to verify its installed performance.
The anchors were then locked off at 8 kN, applying the required restraining force to stabilise the platform wall.
Testing and lock-off were completed within the available construction window, allowing the railway infrastructure to be returned to service as scheduled.
Project Outcome
The HULK Earth Anchoring System provided a practical and permanent solution for stabilising the deteriorating platform wall.
The system was selected because of its buildability, compact installation requirements and ability to meet the demanding 28-hour project schedule.
The completed works delivered verified lateral restraint to the historic structure while minimising disruption to the surrounding railway environment.
The project demonstrated the suitability of HULK Earth Anchors for heritage infrastructure strengthening, retaining-wall stabilisation and remedial works in confined, access-restricted locations.