Anchoring Rope and Rigging was engaged by Komatsu in Perth to strengthen an existing concrete foundation so it could safely support the installation of a crane.
The solution involved installing three percussion-driven earth anchors through the existing 500 mm-thick concrete footing and into the underlying soil to a depth of 4 metres.
Project Details
Client: Komatsu
Location: Perth, Western Australia
Completion: June 2014
Application: Existing foundation strengthening
Scope: Supply, installation, load testing and certification of three percussion-driven earth anchors
Installation depth: 4 metres
The Challenge
Komatsu required additional foundation capacity before a crane could be installed on the existing footing.
The work area was highly confined, limiting access for large drilling rigs, excavation equipment or conventional foundation-strengthening methods. Any solution also needed to work with the existing structure rather than requiring the footing to be demolished and rebuilt.
The anchoring system therefore needed to:
- Be installed through the existing concrete footing
- Achieve the required design loads in Perth dune sands
- Operate within a restricted work area
- Minimise disruption to the surrounding site
- Be tested and certified before the crane installation proceeded
The Solution
Suitably sized holes were first cored through the 500 mm concrete footing at the specified anchor locations.
Anchoring Rope and Rigging then installed three percussion-driven HULK Earth Anchors through the cored openings and into the underlying dune sands to a depth of 4 metres.
Compact, handheld hydraulic equipment was used throughout the installation. This removed the need for large machinery and allowed the crew to operate efficiently within the confined site.
Once installed, the anchors were connected to the existing footing to provide additional resistance and strengthen the foundation for the proposed crane loads.
Load Testing and Certification
Each earth anchor was individually load tested to confirm that it achieved the specified capacity.
The Perth dune sands provided suitable ground conditions, and the required loads were reached without difficulty.
Following successful testing, the anchors were certified by Anchoring Rope and Rigging, providing verified performance before the crane installation.
Project Outcome
The complete installation, testing and certification process was completed in record time.
By installing the anchors directly through the existing footing, Komatsu avoided the time, cost and disruption associated with demolishing and reconstructing the crane foundation.
The project demonstrated the efficiency of percussion-driven earth anchors for strengthening existing foundations, particularly where site access is restricted and conventional construction methods are impractical.